
2-30
SECTION 2 – CONNECTING AND SEQUENCING WING LIFT
4. Before raising outer wings for the rst time, make sure wing lift cylinder attach eyebolts are
loose.
– Slowly raise part 2 wings into transport position.
– Fully retract part 2 cylinders and let wings rest against transport supports. Test adjustment
of sequencing valve before turning set screw. If valve is set with too much pressure, part 1
wings will not rise. To reduce the amount of pressure, turn set screw outward.
– With cylinders fully retracted and part 2 wings resting on transport supports, adjust cylinder
attach eyebolts so cylinders allow lift link rollers to rest on the bottom of slot. Tighten nuts.
5. Before raising part 1 wings for the rst time, make sure cylinder attach eyebolts are loose.
– Slowly raise wings by fully retracting part 1 wing lift cylinders, allow wings to rest against the
transport locks. If wing does not rest against both locks, adjust locks accordingly.
– Tighten cylinder attach eyebolts so cylinders allow part 1 wing lift rollers to rest on the bottom
of slot.
6. Lower wings to eld position.
– Make sure the part 1 wing lift cylinders fully extend before part 2 wings start to move. Test the
adjustment before turning set screw. If the valve is set with too much pressure, the part 2
wings will not unfold. To reduce the amount of pressure, turn set screw outward.
7. Fold and unfold machine again to make sure that everything is working properly.
Komentarze do niniejszej Instrukcji